Maintenance
What exactly are the reasons for the excavator's sluggish movement and slow speed? We've found it for you!
1. Whether the data from the high and low pressure sensors are normal;
2. Whether the data of the electromagnetic proportional valve group is normal;
3. In the absence of alarm content and when all the above data are normal, it is often the case that the valve core of the multi-way valve does not switch properly, resulting in stuck action and slow speed.
If the valve core gets stuck, the following measures should be taken
1. Disassemble the valve core for inspection and clean it with diesel.
2. If there are no impurities, it is likely that the valve core itself is faulty and stuck, and it needs to be replaced.
Regarding the multi-way valve of the excavator
The multi-way valve, as an important component of the excavator's hydraulic system, serves to determine the oil supply routes and methods from the hydraulic pump to each hydraulic action element, as well as the flow distribution when multiple hydraulic action elements act simultaneously or in a compound manner. Next, we will provide a detailed explanation of the name, function and location of the multi-way valve core of Kobelco's 20-30 ton excavators, so that friends can promptly locate the valve core and solve similar problems when they encounter them.
Related articles
- Pump Truck Operation Safety Manual: Even Experienced Drivers Can't Be Careless!
- Full of cutting-edge technology! The XCA200G8-1 shows you what the hardcore romance of the G2 genera
- When it comes to engine "blood replacement", there are certain considerations. How to choo
- What are the precautions for the construction of motor graders?
- At Bauma 2025, a variety of new products made a grand debut in the Wirtgen exhibition area
- It has soared by 114% year-on-year! Yuchai Corporation's engine orders in January reached a record h
- What should I do if the excavator turns slowly?
- Bobcat: This forklift enables the warehouse to "take a deep breath" too!
- What should I do if the excavator won't start?
- Construction Site Report: Wirtgen W 155 CFIs are clustered on the Shanghai-Wuhan Expressway, and the