Maintenance
How to install and maintain the clutch of a loader?
The installation and maintenance of the clutch are:
When installing the clutch, calcium-based grease should be filled in the inner cavity of the release bearing. This machine has a grease nipple on the outside of the release bearing, and vaseline (grease) should be injected regularly and in limited quantities.
2) When installing the clutch, the locating manhole should first be inserted into the bearing to ensure that the splined holes of the main and auxiliary friction plate assemblies are concentric with the flywheel, facilitating the connection and installation of the transmission assembly.
3) The maintenance contents include cleaning the shell, checking and adjusting the separation gap, regularly injecting lubricating grease, and cleaning the oil stains on the friction plates when necessary.
Related articles
- Sany Heavy Industry: Thousands of Questions on Maintenance and Repair: Air Mixed into the Hydraulic
- Xingbang Heavy Industry: "Debut" from the factory! Watch the "All-Rounder Armor"
- How to install and adjust the speed control motor of the CAT325L excavator
- Heat Hazards and Fault Analysis of Excavator Hydraulic System
- The working principle and troubleshooting methods of the hydraulic overload protection system for me
- The Experience of Road Construction and Maintenance in a major agricultural Province - The Experienc
- Analysis and Elimination of Common Faults in the Hydraulic System of Vibratory Rollers
- Detection and use of old construction machinery to delay the aging of equipment
- The use and maintenance of loaders in winter
- Huamei heavy trucks pioneered the "Parts Bank", with a pre-deposit of 300,000 yuan for eac

