I want to talk about the physical reality of flatwork. Decades ago, before the widespread adoption of the vibratory power screed, we struck off every slab using a heavy, bowed 2x4 piece of lumber and sheer brute force. You’d have a guy on each end, bent over at the waist, pulling and sawing the board back and forth across the wet mud. By the end of a 200 square meter [approx. 2,150 sq. ft.] driveway pour, your lower back would be screaming, and your forearms would be completely pumped out.T