When I watch a rookie step onto a slab with a walk-behind gasoline power trowel, they usually just wander around like they're pushing a lawnmower without a plan. In commercial concrete finishing, the pattern you cut across the floor dictates the absolute flatness of the final grade. You can't just chase the wet spots. A standard 900 mm [approx. 36-inch] machine requires a disciplined, geometric approach to ensure you don't create "birdbaths" (low spots) or ridges.
I always teach my crews the "cross-hatch" method. On your initial float pass, you run the machine North-to-South across the entire slab. You must overlap every single pass by exactly 50%. This means the center of your spider assembly should be tracking over the outer edge of your previous pass. This overlapping ensures that the heavy 100 kg [approx. 220 lbs] machine is constantly cutting the high spots and moving that wet "cream" into the low spots evenly. Once the North-South pass is complete, you immediately step back onto the slab and run an East-West pass. By changing the directional axis 90 degrees, the commercial-grade 4-stroke engine powers the blades across the grain of the previous pass, acting like a giant block sander. If you just run in circles or stick to one direction, the centrifugal force of the blades will eventually push the mud to the edges, hollowing out the center of the room. It takes discipline, a mapped-out plan, and the stamina to hold a heavy gas machine on a perfectly straight line.