In the construction business, time is the primary variable of profit. One operator behind a walk-behind power trowel can often perform the work equivalent to a four-man manual crew. This efficiency does not just save on labor costs; it ensures the entire pour reaches the same level of finish simultaneously, preventing "cold joints" or inconsistent textures across the floor.




